Hotelbeds.com: Difference between revisions

Jump to navigation Jump to search
No edit summary
No edit summary
Line 64: Line 64:
== Multiple contracts ==
== Multiple contracts ==
Specify the first contract in the channel manager settings. Make sure "Hotelbeds" is ticked in the "Channels" tab of all rates you want to send to this contract.  
Specify the first contract in the channel manager settings. Make sure "Hotelbeds" is ticked in the "Channels" tab of all rates you want to send to this contract.  
Multiple contracts require rates to be defined for each contract.


Open the rates you want to send to the second contract. Go to the "Channels" tab. Tick "Hotelbeds" and enter the contract name, sequence and office code for this contract separated by the / symbol.  
Open the rates you want to send to the second contract. Go to the "Channels" tab. Tick "Hotelbeds" and enter the contract name and sequence for this contract separated by the / symbol.
 
Example: NRF-BAR/45678
 
If the office code for the contract is different to that set in the channel manager settings, it can be specified as a third item in the rate setting.


Example: NRF-BAR/45678/164
Example: NRF-BAR/45678/164


Daily prices and all rates in which you have not specified a contract will send to the first contract.  
 
 
Daily prices and all rates in which you have not specified a contract will send only to the first contract.  


[[Image:hotelbeds2.png|350px|link=]]
[[Image:hotelbeds2.png|350px|link=]]